I don't use the scheduled date or delete date when I do imports, so I've never run into this problem.
But, if you left the date completely out of an entry, without the pipe separator, then the expected date info will not be in that column and it will read whatever is in the next column, etc. all the way to the end of that data line.
Last edited by Toby; 2018-04-11 at 02:13 PM..
|